property - loans - mortgages - houses

Pyramid 2 Resort

Overview



If you are looking for one of the most sought after developments in Hurghada then the Pyramids 2 Red Sea Resort is for you. This development is well on course to becoming one of the most popular and desired locations in Hurghada.
The development is being built to high luxury standards with an beautiful surroundings rivalling some of the best projects in Hurghada.
The project will contain 192 apartments offering a choice of one, two and three bed-roomed apartments. The build quality will be to high quality European standards.
This is an ideal property for sale in Egypt for people looking for everything in a project. If you are looking for a project for investment or for living, Pyramids 2 is a good choice. The excellent facilities and the highly desired location make this project an excellent choice.

Location


if being in good location is important to you, then Pyramids 2 has it all for a good Egypt property sale. The development is located just 250 M away from the gorgeous Red Sea and access to shopping and restaurants is only 5 minutes into the bustling Hurghada town In addition to that, a new shopping complex can also be found just 250 m away.
If that wasn’t enough, the famous El Gouna Resort with a 8-hole PGA Professional golf course is only fifteen minutes from the development. The project is within easy access of the Hurgahda airport, just 10 minutes away.

Facilities

  • Play area for the kids
  • A UK developer is constructing the development.
  • The properties come with a ten tear guarantee by the builder
  • Beautiful tropical gardens spanning an impressive 7000metres²
  • The use of a large size swimming pool that consists of a section for the children
  • A restaurant that will offer a variety of cuisines
  • Gated development with continuous twenty four hour security
  • There will be a shuttle service offered free of charge to the beaches, Hurghada and golf course
  • The availability of A property rental management service
  • The annual maintenance charge will be charged at just 500.GBPa year
  • There will be a well fully gymnasium on site
  • The availability of a café bar with internet business centre
  • The availability of a mini market
  • Laundry facilities and service
  • Barbecue facilities on the large communal roof

Finishing for apartments

  • Kitchen and bathroom will have ceramic tiles on the walls.
  • Ceramic tiles on kitchens and bathrooms floors
  • Cream coloured interior paint with Façade painted in single-layer coloured paint.
  • The plumbing of the interior is in PVC
  • Floors of the living area, bedrooms, corridors and the entrance hall will have polished cream marble effect ceramic tiles.
  • Single Pane glass windows
  • The interior carpentry will include white lacquered doors with chrome/steel/brass handles.
  • Carpentry on the outside will be in aluminium or wood surroundings.
  • Installation of smoke detectors in the rooms
  • Electrical installations including standard sockets and light fittings
  • Apartments ready for telephone, digital television and high speed internet connection
  • Fitted kitchen equipped with granite work surfaces, stainless steel sink with base units and mixer taps
  • Bathroom fitted with white porcelain sink, toilet, shower and bath with mixer taps and extractor fan.
  • Air conditioned pre-installed.


Studio Apartment Layout


One-Bedroom Apartment Layout


Two-Bedroom Apartment Layout

 

Prices

Type

m2

GBP

EUR

USD

Studio - Min

38

17800

25151

36579

Studio - Max

49

21500

30380

44183

1 Bed - Min

48

27000

38151

55485

1 Bed - Max

75

35750

50515

73466

2 Bed - Min

76

37000

52281

76035

2 Bed - Max

103

45760

64659

94037

3 Bed

115

54450

76938

111895


The payments will be accepted in British Pound Sterling and pricing shown in any other currency are for illustration only and will vary according to current exchange rates.
Payment Schedule

  • 10% will be payable as an initial deposit
  • 40% payable on the signing of contracts which will be within 30 days of the initial deposit
  • 25% staged payment
  • 25% completion payment.

Completion

The construction for this development commenced in the summer of 2007. The scheduled completion time is summer 2009.